PHOTO ALBUM |
||||||||||
![]() |
(Left) Going over the working drawings at the maintenance shop area.
(Right) Much of the work was fabricated on the ground. |
|||||||||
![]() |
||||||||||
![]() |
![]() |
|||||||||
| (Left) Park Volunteers pull on ropes hoisting up a support section to a Canopy Constrution associate waiting above. | ||||||||||
| (Above) Park Manager, Robert Dye passes a 2x4 to a fellow worker above. | ||||||||||
![]() |
(Left) High above the ground, a worker attaches supporting steel cables.
(Right) Part of the construction crew celebrates a "topping out". |
|||||||||
![]() |
||||||||||
![]() |
||||||||||
![]() |
||||||||||
| (Left) One of the construction crew makes an inspection walk on the new platform. | ||||||||||
| (Above) A local TV News reporter files a story about the new work. | ||||||||||
| Return to Myakka Canopy Walkway | ||||||||||